SHIFT PAY GUIDE
Pitman vs DuPont: 12-Hour Rotating Schedules Compared
Updated August 27, 2026 · First published August 13, 2026
Both Pitman and DuPont cover 24/7 operations with four crews on 12-hour shifts — but they feel completely different to live on. Pitman is steady and predictable; DuPont trades a brutal stretch for a full week off every month. Here's the honest comparison, with the hours and overtime computed from the cycles rather than remembered from the break room.
Pitman (2-3-2): the steady one
The Pitman template is 14 days: 2 on, 2 off, 3 on, 2 off, 2 on, 3 off — the same on/off rhythm as the 2-2-3 Panama. Most Pitman crews work that template on days for two weeks and then on nights for two weeks, so the full rotation is 28 days with 14 shifts. Never more than 3 shifts in a row, every other weekend off on days and on nights alike, and weekly hours that alternate between a three-shift week and a four-shift week.
Because the day/night flip happens on a three-day break, Pitman crews get a runway to turn their sleep around. Some sites slow the rotation to monthly or quarterly, and some don't rotate at all — that fixed version is just the 2-2-3.
DuPont: the week-off one
The DuPont cycle runs 28 days: 4 night shifts, 3 off, 3 day shifts, 1 off, 3 nights, 3 off, 4 days — then 7 consecutive days off. That built-in vacation every month is why crews defend it fiercely, and why departments that try to replace it get petitions.
The cost: one 72-hour week inside every cycle, a single recovery day mid-cycle, and day/night flips baked into the pattern — you switch direction twice per cycle, once after a one-day break. Sleep scientists wince at it; plenty of plants have run it for decades anyway.
Head to head, computed
Same crews, same 12-hour shifts, same 42-hour average — different everything else. Overtime is shown as a range because the number of hours in a 'week' depends on which day your employer's workweek begins; the low end is the friendliest alignment and the high end the harshest.
| Metric | Pitman | DuPont |
|---|---|---|
| Cycle length | 28 days | 28 days |
| Shifts per cycle | 14 | 14 |
| Average hours per week | 42 | 42 |
| Longest stretch on | 3 shifts | 4 shifts |
| Longest break | 3 days | 7 days |
| Longest week (best–worst alignment) | 48–60 h | 48–72 h |
| Weeks over 40 h per year | 26 | 26–39 |
| Overtime hours per year at 40 h | 208–520 | 208–624 |
Computed from the cycle definitions on the Pitman and DuPont schedule pages, scanning every workweek start day.
Which is better for overtime?
Neither, on average: both are 42-hour schedules, so under a 40-hour weekly rule both produce the same overtime in the best alignment (208 hours a year). The difference is the shape. Pitman delivers it as a steady 8 hours every other week. DuPont concentrates it into the 72-hour week — up to 32 overtime hours in one check — followed by a week with nothing.
DuPont's worst-case alignment is also harsher: 624 overtime hours a year versus Pitman's 520, because a badly placed workweek can pile a 4-shift stretch and a 3-shift stretch into the same seven days. If your employer pays a differential on nights, DuPont's big week is often a night week, so the overtime premium lands on the higher differential-included rate. Good for the check, bad for the body.
Which is better for sleep?
Pitman, clearly — and fixed-crew Pitman (the 2-2-3) most of all. Its longest stretch is three shifts, every direction change gets a break of at least two days, and if the crews don't rotate there are no direction changes at all. DuPont asks for four nights in a row, then a flip to days after three days off, then back to nights after a single day off. That one-day turnaround is the hard part: there isn't time to reset before the next block starts.
DuPont people will tell you the week off makes up for it, and for a lot of them it does — they treat it as a monthly reset and take real trips. If you're choosing, be honest about which you'd rather have: even weeks or a real vacation every 28 days.
Which is better for weekends and family?
Pitman's answer is simple: every other weekend off, permanently, on days and on nights alike, and a three-day weekend at that. You can tell your family which weekends are yours for the whole year. DuPont's weekends are irregular. Its 28-day cycle holds four weekends; the week off covers one completely, and the others are cut up by the four-night and four-day blocks in ways that depend on where the cycle starts. Some DuPont crews get two clean weekends a cycle, some get one and a half.
For parents of school-age kids, Pitman's predictability usually wins. For people who want to travel, DuPont's week off is hard to beat — seven days without touching PTO, twelve or thirteen times a year. Neither is wrong; they're built for different lives.
Paycheck reality
DuPont's 72-hour week means a monster check once a cycle, followed by lean ones — budgeting on DuPont means saving from the big check for the off week. Pitman pays more evenly. Either way, knowing which weeks are heavy is exactly the problem ShiftCheck solves: stamp the pattern with rotation autofill and read each paycheck off the calendar.
DO THE MATH FOR YOUR NUMBERS
FAQ
Which schedule has more overtime?
Both average 42 hours/week across their cycles, so total OT is similar in the best alignment (208 hours a year) — DuPont just concentrates it into one 72-hour week per cycle while Pitman alternates three- and four-shift weeks. In the worst workweek alignment DuPont produces more (624 vs 520 hours).
Is the DuPont week off paid?
It's not extra PTO — it's the scheduled off-phase of the cycle. Your pay comes from the heavy weeks earlier in the cycle, including the 72-hour week.
Which is better for sleep?
Pitman with fixed crews, clearly — no forced day/night flips. DuPont's rotation inside every cycle, including a flip after a single day off, is the hardest part of living on it.
Are Pitman and 2-2-3 the same thing?
Same daily template. 2-2-3 (Panama) usually means fixed day and night crews on a 14-day cycle; Pitman usually means the crews swap between days and nights every two weeks, a 28-day cycle.
SHIFTCHECK FOR IPHONE
The app that applies every rule in this guide.
Paint your shifts on a calendar — differentials, weekly overtime, holiday premiums, and time off computed automatically. Know your paycheck before it lands.
Free calendar · $14.99 once for the full pay engine · no subscription